Block prior to works commencing (existing coatings were a Permarock EWI System, which had dramatically failed in locations and was beyond the warranty period) and see our perfectly completed project. Shown before and after refurbishment.
Pelly Court E17
Pretoria Road / OT Adaptations
The existing bathroom had been converted to a wet room to accommodate the resident, However, this had not been successfully undertaken, with the cross falls to the flooring laid incorrectly which when the shower was on caused the water to cascaded through the doorway onto the landing area and through the ceiling affecting the rooms […]
67 Priors Croft E17
A newly completed void refurbishment. Brought back to living able state. Including kitchen, bathroom, living room and bedroom. Shown before and after refurbishment.