St Georges Court
St Georges Court, at Wood Street has been recently refurbished and its interior refreshed. The hallway and corridors got new carpets and flooring, also walls were repainted. New door fittings and signage replacement. It included also internal decoration works, kitchen and bathroom refurbishment with new installations.
Read MoreSt David’s Court
St David’s Court, at Pakstone also has been recently refurbished and its interior refreshed. The hallway and corridors got new carpets and flooring, also walls were repainted. New door fittings and signage replacement. It included also internal decoration works, kitchen and bathroom refurbishment with new installations.
Read MoreFred Wigg and John Walsh
The existing reception areas were an un-inviting and dated space, attracting anti-social behaviour and considered dangerous by the residents. The brief was to upgrade the reception areas and turn these into a safe, modern and manned concierge area, so as to deter anti-social behaviour. The works had to be undertaken during normal working hours with […]
Read MoreClifton House
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed ut nisi eget odio tincidunt sollicitudin. Nulla neque dui, blandit sed imperdiet ac, luctus non nsl. Nam purus augue, tempor at cursus non, iaculis ac quam. Pellentesque mauris felis, fermentum ut sagittis in, vulputate pellentesque turpis.
Read MoreThe Grange London E17
Concrete and render repair, also external decorations, walkways, private balconies and ballustrades have been done.
Read MoreHolmcroft House
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed ut nisi eget odio tincidunt sollicitudin. Nulla neque dui, blandit sed imperdiet ac, luctus non nsl. Nam purus augue, tempor at cursus non, iaculis ac quam. Pellentesque mauris felis, fermentum ut sagittis in, vulputate pellentesque turpis.
Read MoreTenby Court E17
Full external decoration, chemical cleaning, concrete and windows repair including uPVC cladding.
Read MoreRolls Park Avenue E4
Facades and external walls repaired and rendered along main Rolls Park Avenue street scape.
Read MorePlaxton Court / Sheltered Accomodation
The existing communal decorations and carpet had become dated, worn and in need of a complete renewal from top to bottom. Fire rated internal decoration and new carpet throughout all communal areas were undertaken and given the communal areas a bright, fresh and pleasant environment to live within.
Read MoreMillfield Road E17
Block prior to works commencing (existing coatings were a Permarock EWI System, which had dramatically failed in locations and was beyond the warranty period) and see our perfectly completed project. Shown before and after refurbishment.
Read MorePretoria Road / OT Adaptations
The existing bathroom had been converted to a wet room to accommodate the resident, However, this had not been successfully undertaken, with the cross falls to the flooring laid incorrectly which when the shower was on caused the water to cascaded through the doorway onto the landing area and through the ceiling affecting the rooms […]
Read More67 Priors Croft E17
A newly completed void refurbishment. Brought back to living able state. Including kitchen, bathroom, living room and bedroom. Shown before and after refurbishment.
Read More405 Forest Road / Timber fencing
Full new fencing improved street scape look and functionality
Read MoreGrosvenor Park Road / Metal fencing
Completed project One of our metal fencing projects in East London
Read MoreHatherley Road E17 / Hatherley House
A series of garages had been refurbished and staircase repainted.
Read MoreKimberly Way E17
Full refurbishment of garages, including new doors, gutters and down pipe.
Read MoreBlackhorse Lane E17
Full refurbishment of garages, including new doors, tarmac driveway, gutters and down pipe.
Read MoreStocksfield Road / Tarmac
Project brief was to identify and replace all broken estate paving, relay uneven areas, rebuild/repair slip walling, repair manhole covers, paving and tarmac existing service road.
Read MoreBlackhorse Lane
Existing drying area was tired, health and safety issues, impractical for the residents to use.
Read More